{"id":262,"date":"2023-05-21T08:56:59","date_gmt":"2023-05-21T08:56:59","guid":{"rendered":"http:\/\/alkf.alignlab.com\/?post_type=project&#038;p=262"},"modified":"2023-08-20T11:26:37","modified_gmt":"2023-08-20T11:26:37","slug":"hong-kong-international-airport","status":"publish","type":"project","link":"https:\/\/alkf.alignlab.com\/zh-hans\/project\/hong-kong-international-airport\/","title":{"rendered":"Hong Kong International Airport Data Centre and Multipurpose Building"},"content":{"rendered":"<!-- 1 col, 1 popup, popup big 1 -->\n<div class=\"popup_image prd_sc2\">\n  <div class=\"alkf_project_detail_banner sh_775 reveal hover_mouse\">\n    <img decoding=\"async\" src=\"https:\/\/alkf.alignlab.com\/wp-content\/uploads\/2023\/05\/z4148653204036_fdfea2c860bbff68478c1e0e156c30c0.webp\" alt=\"C19W05 Airport_3\"\/>\n  <\/div>\n  <button class=\"apply_career apply_pop\" data-id=\"pop_index_1\">\n    <span class=\"btn-plus-pop\"><\/span>\n  <\/button>\n<\/div>\n\n<div class=\"prd_sc5\">\n  <div class=\"alkf_project_detail_tR reveal\">\n    <p class=\"text project-detail-alkf-text\">\n      Project challenges    <\/p>\n  <\/div>\n  <div class=\"alkf_project_detail_sc reveal no_margin_top\">\n    <div class=\"alkf_text_left text project_title_text_full_width\">\n      <div class=\"content\">\n        <p><\/p><p>The Project consists of two 5-storey blocks interconnected by a central link corridor. It is situated in a challenging location, in the middle of the Chek Lap Kok International Airport and in front of the Midfield Terminal. The project faces significant design and construction challenges due to its unique position.<\/p><p>This development, known as the &#8220;ramp building,&#8221; serves as a crucial hub for the AAHK services team. It accommodates various functions, including a vehicle maintenance depot, offices, a canteen, and a Tier III Data Centre. However, the design of the building is subject to restrictions imposed by the airport, such as the Low Level Air Flow Study of the Building Wake Effect conducted during the feasibility stage. Additionally, the building&#8217;s front and back face rows of airplane parking spaces. These site constraints necessitate a building fa\u00e7ade design that adheres to specific color schemes and minimizes visual impact on pilot visibility.<\/p><p>During the construction phase, strict adherence to airport house rules and construction boundaries is essential. This ensures that the normal operations of the airport are not interrupted and that the overall safety of airport operations is not compromised by the development&#8217;s construction.<\/p>      <\/div>\n    <\/div>\n  <\/div>\n<\/div>\n\n\n<div class=\"alfk_project_detail_content prd_sc7 reveal hover_mouse\">\n  <div class=\"alfk_box_left sh_1328 text\">\n    <div class=\"popup_image\">\n      <div class=\"custom\">\n        <img decoding=\"async\" src=\"https:\/\/alkf.alignlab.com\/wp-content\/uploads\/2023\/05\/z4148653233925_ab28f3528da6caeb5c46619dd0436d87-684x1330.webp\" alt=\"C19W05 Airport_4\" \/>\n      <\/div>\n      <button class=\"apply_career apply_pop\" data-id=\"pop_index_1\">\n        <span class=\"btn-plus-pop\"><\/span>\n      <\/button>\n    <\/div>\n  <\/div>\n  <div class=\"alfk_box_right sh_1328 text\">\n    <div class=\"alfk_box_top sh_797\">\n      <div class=\"popup_image\">\n        <div class=\"custom\">\n          <img decoding=\"async\" src=\"https:\/\/alkf.alignlab.com\/wp-content\/uploads\/2023\/05\/z4148653183014_c2ba8fcaaf79f800e8e1567b71ba826b-684x900.webp\"  alt=\"C19W05 Airport_5\" \/>\n        <\/div>\n        <button class=\"apply_career apply_pop\" data-id=\"pop_index_1\">\n          <span class=\"btn-plus-pop\"><\/span>\n        <\/button>\n      <\/div>\n    <\/div>\n      <\/div>\n<\/div>\n\n<div class=\"prd_sc5\">\n  <div class=\"alkf_project_detail_tR reveal\">\n    <p class=\"text project-detail-alkf-text\">\n      Project solutions    <\/p>\n  <\/div>\n  <div class=\"alkf_project_detail_sc reveal no_margin_top\">\n    <div class=\"alkf_text_left text project_title_text_full_width\">\n      <div class=\"content\">\n        <p><\/p><p>Strict adherence to airport requirements is of utmost importance throughout the project. Through meticulous planning and extensive discussions with end-users, the project team has successfully integrated the required program into the building, ensuring smooth circulation for users and efficient operational logistics.<\/p><p>When it comes to fa\u00e7ade design, a thorough study of various color schemes has been conducted and presented. Additionally, careful consideration has been given to minimize glare from the glazing elements, ensuring optimal visual comfort.<\/p><p>Despite the limitations imposed by construction works within the airport, the project team has overcome these challenges. Thoughtful planning of the construction sequence and efficient logistics for material delivery, aided by the implementation of Building Information Modeling (BIM), have contributed to the successful execution of the project. It is worth noting that despite the impact of the COVID-19 pandemic, the project was completed successfully in 2022.<\/p>      <\/div>\n    <\/div>\n  <\/div>\n<\/div>\n\n\n<!-- 3 col, 3 popup -->\n<div class=\"alfk_project_detail_gid prd_sc10\">\n  <div class=\"alfk_box alfk_box_left\">\n    <div class=\"popup_image\">\n      <div class=\"custom sh_797\">\n        <img decoding=\"async\" src=\"https:\/\/alkf.alignlab.com\/wp-content\/uploads\/2023\/05\/z4148653220185_a8a66d6104cd8bde1dbe8d3fea2f8dc6-684x900.webp\" alt=\"C19W05 Airport_6\"\/>\n      <\/div>\n      <button class=\"apply_career apply_pop\" data-id=\"pop_index_1\">\n        <span class=\"btn-plus-pop\"><\/span>\n      <\/button>\n    <\/div>\n  <\/div>\n  <div class=\"alfk_box alfk_box_center\">\n    <div class=\"popup_image\">\n      <div class=\"custom sh_797\">\n        <img decoding=\"async\" src=\"https:\/\/alkf.alignlab.com\/wp-content\/uploads\/2023\/05\/z4148653219528_f96bd7b0f12bf8a4adc22dbb9dca114c-684x900.webp\" alt=\"C19W05 Airport_7\"\/>\n      <\/div>\n      <button class=\"apply_career apply_pop\" data-id=\"pop_index_1\">\n        <span class=\"btn-plus-pop\"><\/span>\n      <\/button>\n    <\/div>\n  <\/div>\n  <div class=\"alfk_box alfk_box_right\">\n    <div class=\"popup_image\">\n      <div class=\"custom sh_797\">\n        <img decoding=\"async\" src=\"https:\/\/alkf.alignlab.com\/wp-content\/uploads\/2023\/05\/z4148653214261_8b60aeacee4397a427bae357002287e1-684x900.webp\" alt=\"C19W05 Airport_8\"\/>\n      <\/div>\n      <button class=\"apply_career apply_pop\" data-id=\"pop_index_1\">\n        <span class=\"btn-plus-pop\"><\/span>\n      <\/button>\n    <\/div>\n  <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>As an integral part of the digital and maintenance infrastructure for the Hong Kong International Airport\u2019s Three-Runway System (3RS), this one-of-a-kind state-of-art high-tier data centre and vehicle maintenance depot facility cum airport office accommodation will create an all new infrastructural platform of virtual and physical technologies to cope with the Hong Kong International Airport\u2019s future air traffic growth and to maintain Hong Kong&#8217;s competitiveness as an international aviation hub.<\/p>\n","protected":false},"featured_media":851,"template":"","meta":{"_acf_changed":false},"group":[67,85,69,13,51,83],"completion":[17],"class_list":["post-262","project","type-project","status-publish","has-post-thumbnail","hentry","group-architectural-design","group-data-technology","group-facade-design","group-infrastructure","group-interior-design","group-work-place","completion-17"],"acf":[],"_links":{"self":[{"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/project\/262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/media\/851"}],"wp:attachment":[{"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/media?parent=262"}],"wp:term":[{"taxonomy":"group","embeddable":true,"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/group?post=262"},{"taxonomy":"completion","embeddable":true,"href":"https:\/\/alkf.alignlab.com\/zh-hans\/wp-json\/wp\/v2\/completion?post=262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}